Structures Technical Session
Session Chair: Michael P. Freeman, PE, AREMA Functional Group Vice President
Union Pacific Railroad
Session sponsored by
8:00 – 8:30 AM
Triumph on the Turkey River: A Case Study on the Emergency Replacement of 400’ of Bridge Superstructure Washed out by Floodwaters
Michael Keller, PE, HDR, Karl Rittmeyer, PE and Patrick Flannery, PE, Canadian Pacific
8:30 – 9:00 AM
CSX Transportation Br. A605.25, over the St. Mary’s River, Truss Counter Removals and Eye-Bar Conversions Without Disruption to Rail Traffic
Daniel A. Doty, PE, Alfred Benesch & Co., Jacob Metcalf and Michael Dumais, EIT, CSX Transportation
9:00 – 9:30 AM
Replacement of CSX Through Truss over the Satilla River Channel: A Different Approach to Accelerated Bridge Construction Using a Heavy-Lift Crane
Willis S. White, III, PE, CFM, STV Inc., Patrick Curtsinger, PE, Hall Contracting of Kentucky, Inc. and Angela B. Johnson, CSX Transportation
9:30 – 10:00 AM
SMART Precast Concrete Trough Rail Bridges
Brian Olp, PE, STV Incorporated and Nick Slama, Stacy and Witbeck
10:00 – 10:30 AM
Coffee Break
10:30 – 11:00 AM
Design & Construction Techniques to Maintain Rail Service Throughout Repairs to the CSX Bridge over Chef Menteur Pass
James Caster, PE and Andrew Cestaro, PCL Civil Constructors, Inc., R. Matthew Crawford, PE, CSX Transportation
11:00 – 11:30 AM
Design and Ownership Considerations for Remote Control Bridges
Raymond Lopez, III, PE and Kevin M. Ciampi, PE, Hardesty & Hanover, LLC
11:30 AM – Noon
Improved Fatigue Life Estimation of Riveted DPG Railroad Bridge Using Reliability Analysis
Anna M. Rakoczy, PhD and Duane E. Otter, PhD, PE, Transportation Technology Center, Inc. (TTCI)
12:15 – 2:00 PM
Annual Committee Chairs Luncheon (Ticketed Event)
Keynote Speaker - Coming Soon
2:00 – 2:30 PM
Metra Bridge Z-100 over the Fox River: Using ABC Techniques and Innovative Design Details to Overcome Site Access Challenges
Lawrence L. Kirchner, PE, SE, TranSystems, D. David Moses, PE, Gannett Fleming, Inc. and Jim Carson, ICC
2:30 – 3:00 PM
A Framework for Efficient Management of Railroad Bridge Strikes
Brett Story, Southern Methodist University, Walter F. Bleser, II, PE and David R. Masceri, Jr., SENSR
3:00 – 3:30 PM
Trinity River Express Bridge Replacement - Threading the Needle Between Clearance Requirements
Ryan Bateman, PE, SE and Cassandra Wallof, PE, HDR, William Richey Thompson, PE, Trinity Metro
3:30 – 4:00 PM
Coos Bay Swing-Span Bridge Column Collapse and Repair - A Monumental Undertaking
Gene A. Davis, PE, Stantec Consulting Services Inc., Rick Adamek, Oregon International Port of Coos Bay and Richard D. Floyd, PE, Koppers Railroad Structures Inc.
4:00 – 4:30 PM
Unmanned Aerial Systems for Railway Bridge Inspection
Nathan Schuett, PRENAV, Inc. and Steven R. Williams, PE, BNSF Railway