Structures Technical Session
Session Chair: William S. Riehl, III, PE, F.SAME, AREMA Functional Group Vice President
Genesee & Wyoming Inc.
Session sponsored by
8:00 – 8:30 AM
Construction of a 11,712-ft Long Prestressed Concrete Trestle over the Bonnet Carre Spillway
Sandro Scola, P.Eng., Canadian National Railway, Matthew Struemph, OCCI Inc.
8:30 – 9:00 AM
Emergency Limited Access Micropile Support of Damaged Bridge Foundation and Encapsulation for Scour Protection
Kyle Guenther, MS, PE, GeoStabilization International and Ammar Shubair, PE, CSX Transportation
9:00 – 9:30 AM
Advancements in Fatigue Evaluation and Design for Steel Railway Girder Bridges
Stephen M. Dick, PhD, SE, Purdue University
9:30 – 10:00 AM
MBTA Gloucester Drawbridge - Construction Challenges Due to Changing Constraints
John Williams, PE, Wiss, Janney, Elstner Associates and Joe Knapp, PE, Genesis Structures
10:00 – 10:30 AM
Coffee Break
10:30 – 11:00 AM
Adapting to Changing Market Conditions - Reevaluating Completely Replacing a Railroad Bridge
Ross M. White, PE, Stantec Consulting Services Inc.
11:00 – 11:30 AM
Lateral Resistance of Timber Bridge Ties and Fasteners on Open Deck Steel Bridges
Christopher L. Johnson, PE and Duane Otter, PhD, PE, Transportation Technology Center, Inc. (TTCI), Matthew Hebdon, PhD, PE, The University of Texas at Austin
11:30 AM – Noon
Toronto Transit Tunnels Rehabilitation
Farrokh Noori, P.Eng, PMP, Hatch Ltd.
Noon – 2:00 PM
Lunch
2:00 – 2:30 PM
Engineering and Construction Challenges for the Main Span Replacement of TRRA Merchants Bridge over Mississippi River, St. Louis, MO
Nick Staroski, PE, SE, TranSystems and Josh Crain, PE, SE, Genesis Structures
2:30 – 3:00 PM
Effective Approaches for Sustainable Asset Management
Darin Charles Welch, HNTB Corporation and Anamaria Bonilla, PE, Metro-North Railroad
3:00 – 3:30 PM
On Passive Protection Analysis of Subsea Immersed Tube Tunnel During Fire Event
Jean Habimana, Hatch
3:30 – 4:00 PM
Application of Prestressed Precast Segmental Concrete Box-girder Construction in an Urban Railway Project
Keyan Yu, Systra IBT
4:00 – 4:30 PM
Argentine Upstream Stoplog Structure: Building a Flood Control Structure Within BNSF’s Largest Classification Yard
Sean Cooney, PE, HNTB Corporation, Joshua Boeckmann, PE and Jared Mewmaw, PE, U.S. Army Corps of Engineers - Kansas City District