Structures Technical Session
Session Chair: William S. Riehl, III, PE, F.SAME, AREMA Functional Group Vice President
Genesee & Wyoming Inc.
Session sponsored by
8:00 – 8:30 AM
MacArthur Bridge West Approach Bridge Replacement in Downtown St. Louis
F. Allen Smith, PE & Jared R. Wigger, PE, Crawford, Murphy and Tilly
8:30 – 9:00 AM
BNSF Sandpoint Junction Connector Project
Ryan Kopera, BNSF Railway and Jason E. Cunningham, PE, SE & Max Rexroad, PE, Hanson Professional Services Inc.
9:00 – 9:30 AM
AREMA/NSBA Steel Railroad Bridge Constructability Guideline
Jaclyn M. Whelan, PE, Consolidated Rail Corporation and Brandon Chavel, PhD, PE, Michael Baker International
9:30 – 10:00 AM
Coffee Break in Exhibits
10:00 – 10:30 AM
Rehabilitation of the CSX Castleton Bridge
Michael Leonard, PE, Colliers Engineering & Design
10:30 – 11:00 AM
Rapid Replacement of Two Bridges Simultaneously on Same Line
Andrew Burkholder, PE and Shanta Keller, VHB
11:00 – 11:30 AM
Protection of Railroad Tunnel Portals Using Steel Rockfall Canopies
Paul Fikse, PE, SE and Ethan Guzek, PG, Delve Underground
11:30 AM – Noon
Historic Stone Bridge Remediation of CSX Acquired Pan Am Railway
Kyle Guenther, MS, PE, GeoStabilization International and Tim Reynolds, PE & Jake Metcalf, CSX Transportation
Noon – 2:00 PM
Lunch in Exhibits
2:00 – 2:30 PM
Norfolk Southern Bridge N 6.66 Rolling Bascule Tread Replacement
Brandon Hinson, PE, PCL Construction, Inc., Nicholas Bayer, PE, Norfolk Southern Corporation and Matthew Cassera, PE, HDR
2:30 – 3:00 PM
CSX Cincinnati & Covington Viaduct Rehabilitation Project: Managing Hundreds of Unique Repairs
Joseph Humbert, PE, HDR Inc. and Timothy B. Reynolds, PE, CSX Transportation
3:00 – 3:30 PM
Consideration of Train Braking and Traction Force Distribution Over Long Bridges
Yong Yang, PhD, PE, SE and Derek Boeldt, PE, SE, Jacobs
3:30 – 4:00 PM
MDOT Jackson & Mechanic Street Railroad Bridge: Case Study
Ryan Cummings, Nicholson Construction
4:00 – 4:30 PM
Advanced Inspection of Timber Bridge Elements
Eric Thornley, PE, SE, SPRAT 3, Collins Engineers
4:30 – 5:00 PM
Evaluation of DPG Railway Bridges Using Vehicle Onboard Systems
Anna M. Rakoczy, PhD, Warsaw University of Technology